derive: per-cluster footprint hulls — twin-tower floors no longer bridged

concave_hull over all points cannot split disconnected masses: 13号 一号楼
standard floors (A/B towers in one floor key) got ONE 135.6m hull and
use_footprint_slabs laid plates across the 36m void (user-visible as
"triangular links" between towers). Points are now union-find clustered
(footprint_cluster_linkage, 6m grid buckets; segment endpoints forced into
one cluster) and hulled per cluster — real link bridges keep clusters
merged via their walls. F4-F10 now 2x49.8m hulls matching the site-plan
OBB; 黄桥/27号 re-derived with no regression; DoD visual check extended
(look at the AIR between masses in front/side views). Regression: twintower
scenario (+3 checks).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
2026-07-03 07:48:22 +08:00
parent c6df3f6ffb
commit 1e11d38fa9
4 changed files with 104 additions and 12 deletions

View File

@@ -282,6 +282,15 @@ glazing 在 walls 之前匹配。3.0m×22 层梯(0..66,机房顶69)。
都大声告警。回归 fo_config 场景。
17. **assemble_campus 每栋 rotation_deg**(27号 4#楼独自斜置):manifest
每栋可覆盖全局旋转。回归 90° 旋转场景。
18. **凹包桥接双塔生成横跨楼板**(13号 一号楼,用户 viewer 目检发现):
一层 key 装 A/B 两塔时 concave_hull 对全部点只出一个包,
use_footprint_slabs 在 36m 空隙上逐层铺板(侧视=塔间"三角连接")。
修复:出包前按端点邻近分簇(footprint_cluster_linkage 6m,网格桶并查集,
段两端强制同簇),每簇独立凹包——真连廊因连廊墙自然连通不受影响。
修后 F4-F10 = 2×49.8m 独立塔包(与总图 OBB 一致);黄桥 F4/RF 北侧
1.4m 长条构件也随之脱离主包(更诚实);27号 各楼无回归。回归 twintower
场景(两簇 40m 距,断言 2 包且无 25m+ 跨包)。教训:**门禁与顶视图对
桥接楼板都不敏感,侧视/正视目检必须看"楼间空气"**——已列入 DoD 目检项。
**已知未修(记录在案)**:③ 图签块 INSERT 定图框(加长A0 被 pitch 截半,
13号教训——mixed-pitch 修复部分缓解,完整方案待设计);⑤ floors_aligned