Log: plot-27 gatehouse + substation end-to-end; site plan has DIM_COOR anchors
Both small buildings pass the pipeline (gatehouse all gates PASS; substation glazing legitimately SKIP, and drop_unsupported_roof_lines auto-removed 43m of elevation-frame bleed — first organic catch on a new project). The site plan carries 104 DIM_COOR coordinate callouts, so plot-27 placement needs no external data. Remaining: the three big building sets, site manifest, campus assembly. Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
@@ -119,6 +119,21 @@ clip 合并——**该能力已存在**:floor_specs 为列表、buckets 按 ke
|
||||
裁剪)。若地库拼接后仍无双塔竖井锚,则需向用户索取绑定 XREF 的总图/
|
||||
立面导出(A-00 总图与 200-299 立面均为壳)。
|
||||
|
||||
## 27号 round 4 进度(2026-07-02 深夜)
|
||||
|
||||
- **门卫(6#)、配电房(5#) 全链跑通**:图框检测(门卫 RF 网格对齐 x=6/y=4 票)、
|
||||
标高实证(门卫 3.8/4.2,配电房 4.2/4.8)、derive/audit/GLB。门卫三门禁全
|
||||
PASS(14 节点/1.2MB);配电房 floors_aligned PASS、glazing 合法 SKIP
|
||||
(变电所无幕墙),`unsupported_roof` 规则自动清掉立面框渗入的 43.2m 悬空
|
||||
屋面线——新规则首次在新项目自然生效。_t8 与 _t3 图层方言在此两例上一致
|
||||
(WALL/CURTWALL/COLUMN/AXIS/DOTE + 材质命名层如"古铜不锈钢/涂料分割线")。
|
||||
- **总平面定位图有真锚**:DIM_COOR 层 104 个坐标标注(贝昂配方首选的
|
||||
"可点坐标")+ 车位/消防道路/道路禁开口段等场布层——27号 摆位数据齐备,
|
||||
不依赖外部补件。
|
||||
- 待办:1#综合楼A(42框)、1#B区(49框)、2#(23框)三个大体量的
|
||||
detect→config→derive 循环;总平面 DIM_COOR 锚点提取与 site_manifest;
|
||||
assemble_campus 装配 + viewer 目检。
|
||||
|
||||
(待续)
|
||||
|
||||
3. **消毒步骤误删 XRECORD 的 999 数值行**(发现于苏州博物馆/test3d-8 首跑):
|
||||
|
||||