Log: plot-13 basement is zoned too; anchor hunt continues next round
The 平时平面 anchor candidate in the garage set is an empty shell (15 lines); zone B1_2 carries real walls/stairs/columns but spans one 40m strip. Zone stitching is mechanically ready (repeated keys + clip trim); if the stitched garage still lacks both tower shafts, the bound-XREF site plan / elevations must come from the user (A-00 and 200-299 are shells). Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
@@ -112,6 +112,12 @@ clip 合并——**该能力已存在**:floor_specs 为列表、buckets 按 ke
|
|||||||
anchor_frame 或跨框共有几何校验。
|
anchor_frame 或跨框共有几何校验。
|
||||||
- 下一轮:先提取 A-03 地库(6,877 实体、16 框)拿到双塔竖井真实间距,
|
- 下一轮:先提取 A-03 地库(6,877 实体、16 框)拿到双塔竖井真实间距,
|
||||||
再回填一号楼翼位与裙房分区,最后叠图核验 + viewer 目检。
|
再回填一号楼翼位与裙房分区,最后叠图核验 + viewer 目检。
|
||||||
|
- round 3 收尾探针结论:地库包的"地上一层平时平面图"锚框候选是空壳
|
||||||
|
(15 条 A_P_LINE);第二区域 B1_2(地下一层平面图)有实内容
|
||||||
|
(A_WALL 377 / A_STAIR 442 / A_COLUMN 73)但也是 40m 分区条带——
|
||||||
|
地库同样要分区拼接(机械能力已具备:重复 key 多 clip + Liang-Barsky
|
||||||
|
裁剪)。若地库拼接后仍无双塔竖井锚,则需向用户索取绑定 XREF 的总图/
|
||||||
|
立面导出(A-00 总图与 200-299 立面均为壳)。
|
||||||
|
|
||||||
(待续)
|
(待续)
|
||||||
|
|
||||||
|
|||||||
Reference in New Issue
Block a user