Generalization round 2 progress: plot-13/27 read stage complete via ODA fallback

ODA auto-fallback validated at scale: plot-13 18/18 files ok (8 rescued),
plot-27 13/13 ok (9 rescued) — previously 9 failed + 8 empty-modelspace
main sheets. Documented the next structural gaps found in plot-13's tower
sheets: multi-wing (座) title prefixes stored as separate text entities,
zoned per-level plans needing multi-clip stitching (one clip per floor today),
and typical-floor (标准层) replication; elevations and site plan are unbound
XREF shells, so storey heights need another source.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
2026-07-02 21:28:40 +08:00
parent 221626b1c7
commit d1ea460042

View File

@@ -46,6 +46,28 @@
还原不了就替换,单个坏图不再拖死整批)。回归测试 +4 项(GBK 合成 DXF
全链路)。
## 13号/27号 进度(读图阶段完成,2026-07-02 晚)
- **ODA 自动兜底在两地块大规模验证**:13号 18/18 全 OK(兜底 8/8)、27号
13/13 全 OK(兜底 9/9)。此前 libredwg 路径下 9 个文件 failed、8 个主图
0 实体,全部恢复(一号楼平面 36,715 实体/70 标题;27号 1#综合楼 89,629
实体/42 标题)。
- **13号 已知障碍(下一轮处理)**:
1. 立面剖面文件(A-0x-200-299)只有 5-6 实体 = 未绑定 XREF 壳——层高无法
从立面标高取,需从 0600 系列(2,834/2,153 实体)找剖面,或按住宅标准
层高推断并如实标注;总图 A-00 系列也偏空(24/159 实体,疑似 XREF 壳),
摆位数据可能要向用户要绑定后的导出。
2. **新结构形态:多座 + 分区平面**(frames_b1 检出 45 候选框):
"A/B座"前缀是独立文字实体(标题只剩"座标准层平面图");地下层每层拆
2-3 张分区图(clip 高度重叠)。正确建模需要 (a) 座前缀归并,
(b) **一层多 clip 拼接**(当前 config 一个楼层只支持一个 clip+offset)
——skill 特性缺口,待设计实现。
3. 住宅"标准层平面图"一框对应 5~26 层:config 需要楼层复制机制
(floor_order 展开或 template floor),当前要手写 N 份同 clip 条目。
- **27号 待启动**:全部图纸可读;总平面定位图 2,166 实体(有真实摆位内容);
建筑为"整套建施一文件"形态(平面+立面混排,28-49 标题),配电房/门卫
是 2 框小体量。
(待续)
3. **消毒步骤误删 XRECORD 的 999 数值行**(发现于苏州博物馆/test3d-8 首跑):